Chiller-plant controls and integration

The chiller plant is often the largest electrical load in an air-conditioned building. We control it as one system and bring every machine’s data into WebCTRL in a form your operators can trust.

Plant
Chillers, pumps, cooling towers and valves
Integration
BACnet/IP, Modbus
Metering
Power, flow, temperatures and plant kW/RT
Acceptance
Every point tested before handover

Plant controls

Sequences written for how your building is actually used, not copied from the last job.

  • Chiller staging Chillers start and stop on measured cooling load, with run hours shared across the machines.
  • Chilled-water reset Supply temperature is raised when the load allows, so the chillers do less work.
  • Variable flow Variable-speed pumps run to what the system needs, including variable primary flow plants.
  • Condenser water and towers Tower fans and condenser pumps are controlled for the best combined efficiency, not just the coldest water.
  • Metering and efficiency Power, flow and temperatures are metered so that plant kW/RT is calculated continuously and can be checked.

Integrating new chillers over BACnet/IP

Our acceptance procedure for a chiller joining a WebCTRL system.

Chiller makers often describe their controllers as “BACnet-ready”. On site, the BACnet interface may still need an option card, a gateway or a licence before it shows the points you need, and some values update too slowly to control from. We treat a new chiller as untested until it has passed these steps:

  1. Agree the points list

    The objects WebCTRL will read and write are agreed with the chiller supplier before delivery, using the maker’s protocol documentation (PICS).

  2. Set up the network

    Device instance, IP address, port and, where the chiller sits on another subnet, BBMD settings are fixed and recorded.

  3. Test every read

    Each value is compared with the chiller’s own display, checking units, scaling and how often it updates.

  4. Test every write

    Setpoints and start and stop commands are tested at the agreed BACnet priority, including what the chiller does when WebCTRL releases control.

  5. Trend a full cycle

    Key values are trended through start-up, load changes and shutdown to catch values that freeze or go missing.

  6. Sign the points list

    The tested list is signed by the chiller supplier and Goldmarktech, and handed to the owner with the graphics.

Read our article on what “BACnet-ready” should mean at handover

At handover you receive

A tested points list
Every object, its test result and the date of the test.
Plant graphics
Live values, alarms and setpoints on WebCTRL screens.
Trends and alarms
Set up and explained to your operators.
The sequence of operation
The written logic the plant follows, updated to as-built.
See all projects
Project Client Location Status Systems
New chiller integrated into WebCTRL A newly installed York chiller brought onto the existing WebCTRL system over BACnet/IP, with every agreed point tested before handover. Food-service group Thailand 2026, in progress
  • WebCTRL
  • BACnet/IP
  • York chiller

Talk to an engineer

Tell us about the building and the plant you need to control, and one of our engineers will get back to you.